What is NRM 2?

RICS New Rules of Measurement: Detailed Measurement for Building Works

Published by the Royal Institution of Chartered Surveyors (RICS), NRM 2 is the modern benchmark standard that replaced the historic Standard Method of Measurement (SMM7). It provides definitive rules and tabulations for drafting Bills of Quantities and quantified schedules of works.

1. Purpose & The NRM Suite Context

NRM 2 is part of a coordinated three-volume measurement suite developed by RICS:

Volume 1

NRM 1

Order of cost estimating and cost planning for capital works.

Volume 2 (Focus)

NRM 2

Detailed measurement for building works and procurement BOQs.

Volume 3

NRM 3

Order of cost estimating and cost planning for building maintenance.

NRM 2 aligns with modern procurement methods (such as NEC, JCT, and PPC2000 contracts), facilitating digital cost management, Building Information Modelling (BIM), and life cycle cost tracking.

2. The 3-Level Tabulation Structure

Unlike traditional free-text methods, NRM 2 standardizes item descriptions using strict, codified 3-level rules:

1

Level 1: Work Package & Component

Identifies the physical element or structure (e.g. In-situ concrete; foundations, ground floor slab, walls).

2

Level 2: Material & Specification

Defines the composition, strength grade, reinforcement details, or thickness (e.g. Grade C30/37; designated mix; thickness 150mm).

3

Level 3: Location & Operational Factors

Captures operational nuances, curved work, height intervals, special surface finishes, or complex access conditions.

3. Key Advantages of NRM 2

  • Dispute Minimization: Explicitly states what is "deemed to be included" in every rate, preventing contractor claims over minor ancillary items.
  • Contractor-Friendly Work Packages: Structured around 41 trade packages matching modern subcontractor procurement instead of legacy craft trades.
  • Standardized Cost Benchmarking: Consistent rules allow reliable historical rate analysis across multiple projects and stages.